CTCI 中鼎集團

Environmental

Environmental

CTCI specializes in easing the environmental impact of global industrial development.

CTCI offers project development, investment, consultancy, feasibility study, engineering, procurement, and construction services for the environmental market, focusing on environmental protection facilities and resources management. Our expertise extends across water and wastewater treatment plants, and air pollution control.

CTCI places a great deal of importance on striving for continual improvement in our environment, and applies green engineering and sustainable principles across our work. Besides the applications in our engineering work and EPC projects for various industries, we also have implemented a number of environmental impact assessments for a variety of markets and applications in Taiwan. 

Water and wastewater treatment

CTCI has completed multiple EPC projects for wastewater treatment plants in a variety of industries, covering refineries and other petrochemical plants, industrial mills, high-tech industrial plants, as well as municipal wastewater. Leveraging our experience in wastewater treatment, we later extended our service to include wastewater reclamation for both municipal and industrial clients, allowing wastewater to be recycled and reused.   

Energy from waste

Within the last 20 years, CTCI offers a comprehensive service for energy from waste industries, covering project development, investment, consultancy, EPC work, O&M service, and waste management service through the integration of resources from subsidiaries and affiliates. In Taiwan, CTCI is the leading company in energy from waste business. CTCI shares over 50% of construction market via different works involved including project management, consultancy, engineering and EPC, as well as shares over 30% of O&M service market. Besides, CTCI owns a unique advantages that CTCI is much familiar with major well known stoker technology in the world through our works adopted different systems.

Air pollution control

For the last 26 years, CTCI has been home to a dedicated Air Pollution Control team, focused on improving the implementation of technology to abate waste gas from large utilities and industrial facilities. CTCI has a track record of cooperating with industry leading boiler, desulfurization, and electrostatic Precipitator , desulfurization, and electrostatic Precipitator equipment manufacturers and catalyst vendors to supply selective catalytic reduction (SCR) De-NOx systems and flue gas desulphurization (FGD) De-SOx facilities and particle removal de-dust systems across Taiwan, Mainland China, Thailand, the Philippines, and the US for the past 26 years. We also implement more reliable advanced air quality control system (AQCS) technology as standard in our undertaking turnkey projects. 

Our expertise

Market coverage


Our work

Major EPC and EPCC projects by CTCI
Project
TYCG Chungli Sewerage System Build, Operate and Transfer (BOT) Project, BOT, Taiwan
Process & Capacity
Wastewater Treatment Plant: Anoxic-oxic (AO) Activated Sludge Process and partial Membrane Bio-Reactor (MBR)
156,800 cubic meter per day
Sewer: 246 km
Household Connection: 199,973 households
Completed
Progressing
Project
KCG Fengshan Shi Wastewater Reclamation Plant Build, Transfer and Operate (BTO) Project, BTO, Taiwan
Process & Capacity
Ultra Filter (UF) and Reverse Osmosis (RO)
45,000 cubic meter per day
Completed
Progressing
Project
CPC Talin Plant Wastewater Reclamation Unit Project, EPCC, Taiwan
Process & Capacity
Membrane Bio-Reactor (MBR) and Reverse Osmosis (RO)
8,000 cubic meter per day
Completed
Progressing
Project
OPTC Kuanyin PTA Line 3 Plant Water Treatment and Effluent Treatment Plants Project, EPCC, Taiwan
Process & Capacity
Water Treatment: 2B3T+Mix Bed; 493 cubic meter per hour
Effluent Treatment: Aerobic and Anaerobic; 380 cubic meter per hour
Completed
Progressing
Project
CPC Linyuan Wastewater Treatment and Reclamation Plant Project, EPCC, Taiwan
Process & Capacity
Membrane Bio-Reactor (MBR) and Reverse Osmosis (RO)
6,000m³/day
Completed
2013
Project
Taichung Wujih Municipal Solid Waste to Energy Plant Build, Operate and Transfer (BOT) Project, EPCC, Taiwan
Process & Capacity
900 tons per day (450 tons per day x 2 trains)
25 MW
Completed
2004
Project
Miaoli Municipal Solid Waste to Energy Plant Build, Operate and Transfer (BOT) Project, EPCC, Taiwan
Process & Capacity
500 tons per day (250 tons per day x 2 trains)
11.8 MW
Completed
2008
Project
Kaohsiung Southern Region Municipal Solid Waste to Energy Plant Project, EPCC, Taiwan
Process & Capacity
1,800 tons per day (450 tons per day x 4 trains)
31 MW
Completed
2000
Project
TPC Taichung Power Plant 1 ~ 4 AQCS Retrofit Project, EPC, Taiwan
Process & Capacity
1,723,000NM³/hr × 4, SOx = 250ppm → 50ppm
Particulate = 1500mg/NM³ → 15mg/NM³
Completed
Progressing
Project
Pagbilao Power Station Unit 3 Expansion Project Seawater FGD, E+P, Philippines
Process & Capacity
1,436,900NM³/HR × 1, SOx: 607ppm → 122ppm
Completed
Progressing
Project
Hwaya / Guanyin Plant Stoker Boilers 1 ~ 3 SCR System, EPC, Taiwan
Process & Capacity
65,585NM³/HR × 3, NOx = 300ppm → 50ppm
NOx removal: 323 T/year × 3
Completed
2014
Project
Huaneng Power International Dalian Coal Power Fired Units 1 & 2 SCR De-NOx Project, E, China
Completed
2,423,280NM³/HR, NOx = 165ppm → 67ppm
NOx removal: 6543 T/year
Completed
2013
Project
Huaneng Power International Dandong Coal Power Fired Units 1 & 2 SCR De-NOx Project, E, China
Process & Capacity
1,143,245NM³/HR, NOx = 300ppm → 50ppm
NOx removal: 5635 T/year
Completed
2013
Project
PTTCHEM I-4/2 Plant F-3101 ~ F-3105 SCR De-NOx Project, EPC, Thailand
Process & Capacity
64,000NM³/HR × 5, NOx = 100ppm → 75ppm
NOx removal: 316 T/year × 5
Completed
2013
Project
James H. Campbell-3 Power Plant SCR System-Phase I, E+P, USA
Process & Capacity
2,900,000NM³/HR, NOx = 194ppm → 35.9ppm
NOx removal: 9243 T/year
Completed
2010
Project
Huhehaote No.1 & 2 Coal Fired Boiler SCR De-NOx System, EPC, China
Process & Capacity
1,166,300NM³/HR × 2, NOx = 187ppm → 37.4ppm
Nox removal: 3583 T/year × 2
Completed
2010
Project
PTT Utility Central Utility Project 1 Phases 4, 5, 6 Plant HRSG SCR Project, EPC, Thailand
Process & Capacity
401,040NM³/HR × 6, NOx = 46ppm → 12.75ppm
NOx removal: 303 T/year × 6
Completed
2009